msimerson avatar msimerson commented on May 25, 2024

Meany Linemen Team

Shortly after successfully repairing the line on November 26, 2021.

IMG_3279

from committee.

msimerson avatar msimerson commented on May 25, 2024

Today the MLT met at the monthly Fossil Luncheon and discussed the "what next" phase. Considerations were brought up:

  • the hot cutout failed to disconnect, leaving the hot conductor to lie on the ground and arc until PSE disconnected it
    • if this had happened in the summer, it could have started a forest fire
    • using an insulated hot could greatly reduce this risk ("tree wire", runs ~$3.50/ft, so about $4k)
    • we've never had a tree fall on the line in the summer. Trees tend to fall in the fall and winter during wind storms.
    • after some failures, hot dripping insulation has started fires
    • insulated overhead wire is much heavier
  • max system load with all (3) 50KVA transformers fully loaded is ~20A
    • the fuse size of 65A on the hot cutout is 350%, consider downsizing it
    • each transformers is rated for 7A and we have 15A fuses on them. Consider downsizing.
    • transformer fuses could be sized closer to 7 * 125% = 9A
  • which type of wire, AAC or AAAC?
    • Ray remembers previous version of the line was ACSR, suggesting that AAC wasn't strong enough
    • measurements taken of the strands and conductors suggest current line is AAAC
    • 2-gage AAAC is rated at 191A, at max we push 20A. Plenty of headroom
    • maintain 2-gage in order to provide tensile strength for ice loading
  • to simplify future repairs
    • have only 2-gage Auto Splices on hand (make it harder to mess up)
    • discard existing short pieces of wire
    • assemble a repair kit with all the needed tools
    • isolate guy wire from conductors
    • after breaks, aim to replace pole-to-pole segments
  • TODO:
    • contact PSE and ask them to replace cutouts
    • buy a supply of 2-gage Auto Splices
    • buy a supply of 2-gage AAAC overhead wire
    • walk the line and note the precise locations of fuses
    • measure pole to pole distances

from committee.

msimerson avatar msimerson commented on May 25, 2024

20211126_113203
20211126_132419
20211126_153640
20211126_154108
20211126_154443

from committee.

Related Issues (20)

Recommend Projects

  • React photo React

    A declarative, efficient, and flexible JavaScript library for building user interfaces.

  • Vue.js photo Vue.js

    🖖 Vue.js is a progressive, incrementally-adoptable JavaScript framework for building UI on the web.

  • Typescript photo Typescript

    TypeScript is a superset of JavaScript that compiles to clean JavaScript output.

  • TensorFlow photo TensorFlow

    An Open Source Machine Learning Framework for Everyone

  • Django photo Django

    The Web framework for perfectionists with deadlines.

  • D3 photo D3

    Bring data to life with SVG, Canvas and HTML. 📊📈🎉

Recommend Topics

  • javascript

    JavaScript (JS) is a lightweight interpreted programming language with first-class functions.

  • web

    Some thing interesting about web. New door for the world.

  • server

    A server is a program made to process requests and deliver data to clients.

  • Machine learning

    Machine learning is a way of modeling and interpreting data that allows a piece of software to respond intelligently.

  • Game

    Some thing interesting about game, make everyone happy.

Recommend Org

  • Facebook photo Facebook

    We are working to build community through open source technology. NB: members must have two-factor auth.

  • Microsoft photo Microsoft

    Open source projects and samples from Microsoft.

  • Google photo Google

    Google ❤️ Open Source for everyone.

  • D3 photo D3

    Data-Driven Documents codes.